ORIGINS
With a history of more than 8 years, the company's shareholders have extensive experience in the field of renewable energy, bringing in addition experience in the development of structures for photovoltaic rooftop parks, owning the company Plast Mould Part. Together we are moving Romania towards a green highway.
MISSION
Our mission is to create a more manageable future for generations to come, and this can only be achieved by developing Romania's renewable energy infrastructure.
DEVELOPMENT
We use our expertise to develop and deliver efficiency and smart consumption solutions dedicated to both B2B and B2C segments, with a focus on green energy - turnkey solutions for energy efficiency, photovoltaic systems, management.
Energy Efficiency
Design - Equipment installation (photovoltaic panels, heat pumps, HVAC installations) - Specialised FDEV teams
Equipment
Electric car charging stations - Inverters - Photovoltaic panels - Heat pumps - HVAC
Engineering and Design
Feasibility studies - Engineering studies - Grid connection studies and projects - Utility network control systems - Obtaining approvals and authorisations
600 kW install in Bucharest ROOFTOP projects with power between 20 - 100 kWp;
MW installedi in projects in Buzau, Slatina, Craiova, Moldova;
MW installedi in Cluj ROOFTOP.
Residential PHOTOVOLTAIC PANEL INSTALLATION
Description: Installation of photovoltaic panel kits with 3kw, 5kw and 15 kw.
Specifications:
Mounted panels: 2.700
Total installed power: 959 kw
Project execution: FDEV specialist teams and specialist subcontractor.